Barge Scaffold, Hackney

Summary

Having successfully completed a similar structure Fourways was instructed to erect a scaffold on the canal side of a building.
The canal bed at the side of the building first had to be dredged to ensure a flat and level base. A barge was anchored to the side of the building and the scaffold structure was then based out. The barge and scaffold base was then sunk to the level bad and the scaffold was completed up to the building roof height.
Hand rails were installed and the structure was Monarflexed.