Warning: call_user_func() expects parameter 1 to be a valid callback, class 'WPSEO_Option_Permalinks' not found in E:\domains\fourwaysplant\www\wp-content\plugins\wordpress-seo\inc\options\class-wpseo-options.php on line 48

Warning: Declaration of clean_walker::start_el(&$output, $item, $depth, $args) should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in E:\domains\fourwaysplant\www\wp-content\themes\fourwaysplant\modules\menu-walkers.php on line 62

Warning: Declaration of clean_walker_page::start_lvl(&$output, $depth) should be compatible with Walker_Page::start_lvl(&$output, $depth = 0, $args = Array) in E:\domains\fourwaysplant\www\wp-content\themes\fourwaysplant\modules\menu-walkers.php on line 117

Warning: Declaration of clean_walker_page::start_el(&$output, $page, $depth, $args, $current_page) should be compatible with Walker_Page::start_el(&$output, $page, $depth = 0, $args = Array, $current_page = 0) in E:\domains\fourwaysplant\www\wp-content\themes\fourwaysplant\modules\menu-walkers.php on line 117

Warning: Parameter 1 to wp_default_styles() expected to be a reference, value given in E:\domains\fourwaysplant\www\wp-includes\plugin.php on line 600

Warning: Parameter 1 to wp_default_scripts() expected to be a reference, value given in E:\domains\fourwaysplant\www\wp-includes\plugin.php on line 600
Ely Boat House, Cambridge University Boat Club Scaffolding Contractors | Fourways Plant London
020 8884 3339

Ely Boat House, Cambridge University Boat Club

Summary

Ely Boat House, Cambridge University Boat Club
Ely Boat House is a new build for Cambridge University Boat Club with assisted funding from the University and alumni from a significant number of old Blues’ and Goldie. The famous rival boat race between Oxford and Cambridge on the Thames has been an annual event since when on the 12th March 1829 the following letter was sent from Cambridge to Oxford:
The University of Cambridge hereby challenge the University of Oxford to row a match at or near London each in an eight-oar boat during the Easter vacation

Fourways Plant Ltd was employed by the principal contractor for full scaffold service from inception to completion. This included full height boarded scaffold with hoist and internal birdcages.

Maps